AIRPORT MARKET

The first worldwide Market place to provide second hands equipments
BAGGAGE HANDLING SYSTEM BUILDINGS AIRCRAFT & AERONAUTICAL INFRASTRUCTURE VEHICLES & MACHINERY PASSENGER UTILITIES CAR PARC ACCES Olympic Games 2024 equipment
THYSSENKRUPP

Boarding bridge

Thyssen passenger bridge series 6, three tunnels, glass walls, length from 19 to 45 metres.
1 pieces in stock
Avaibility : Now
(Please log in to see the price.)

Product details

Gangway available on a pre-installation study for the new location/building. A total of 9 A 380 upper deck gangways (11 metres high) are available and adjustable to a medium carrier height (e.g. A320, 5 metres high).
Tech details
Brand
THYSSENKRUPP
Model / Specifications
Série 6
Date of commissioning
01 Jul 2007
Date of decommissioning
01 Jun 2019
Hours number
Km number

Information request / Account creation

You want to create an account or you simply need more information, please complete this form